In areas not served by public sewer and water, a copy of the well and septic permits issued by Washtenaw County Environmental Health Department must be submitted along with the building permit application.Sewer and water improvement fees must be paid prior to the permit issuance.Qualified homeowners applying for a permit need to complete the Homeowner's Affidavit.Residential Builders and trade contractors must be registered with the township.No payment is required at time of submittal.Commercial remodel or alteration requires a completed Zoning Compliance Application.Plot plan/Site Plan meeting the requirements of our Residential Plot Plan Checklist.Where required by the Occupational Code (Act 299) plans shall be prepared by a Michigan registered architect or engineer and be signed and sealed.Two copies of all other associated documents such as Michigan Energy Code, truss plan and floor system submittal information. Plan submittal requirements are two sets of plans, with one set being no larger than 11" by 17".Two sets of construction documents that demonstrate compliance with the minimum standards of the State Construction Codes.Completed Building Permit Application with Cost of Construction provided.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |